What’s the value of using system simulation?
Previously in our Modelica Series, we’ve seen how system simulation models can be created easily using the Modelica modeling language. Modelica stands out as a very capable language, allowing engineers to model and simulate complex systems with minimal hassle. However, at the end of the day, these technical capabilities add little, or no, value if we use them in the wrong way.
In this blog series, we’ll dig into the value creation of Modelica. While this is a key topic, it’s often overlooked in favor of technical aspects such as modeling, numerical solvers, and tools.
As this is a huge topic, the intention of this series is not at all to give a definitive answer on how to create value using Modelica, but rather to initiate healthy discussions and, maybe, challenge some of the prevailing ideas about value creation in organizations. The inspiration for this comes from real business challenges seen and solved in engineering projects and from digital twin strategy discussions with customers over the years.
In today’s chapter, we’ll get a brief introduction to project cost and risk and discuss how system simulation could fit into that context. In later chapters, we’ll see some concrete examples dealing with cost and risk by directly linking analysis and increased system knowledge to core business objectives.
Dealing with project costs
Let’s start our value creation journey by studying some typical project costs. These are important to understand as they represent the committed investment curve or “money at risk” in projects. Any added value, technical or non-technical, lowers this risk, be it from deeper system knowledge, faster development iterations, or smarter business decisions.
The monthly spending of two example projects is shown in Figure 1. The first project (blue) represents a typical support project or an early-stage evaluation project. Thanks to a fixed team size and a limited number of tools used, its monthly spending can be kept at a close-to-constant level, in this example 10 k€/month. The second project (orange) represents a typical development project. Here we see a monthly cost increase as the need for staff, tools, processes, and testing grows with the project. In the example, the monthly cost starts at 10 k€ and then increases linearly by 1 k€/month.
While both projects have modest monthly costs compared to many real-world projects, costs accumulate over time. This accumulation is shown in Figure 2.
The total cost for the first project grows linearly, whereas it grows quadratically in the second project. Five years into the projects, there is a distinct difference in total cost: 600 k€ in the first project, compared to roughly 2.4 M€ in the second.
It is clear that a complete project failure after five years leads to a higher economic loss in the second project than in the first one. Yet, these cost profiles alone don’t describe the project risks. They tell us how much money is committed, not how likely we are to lose the money. A project with a high probability of economic and technical success carries a substantially lower risk than a project with a low or uncertain probability.
The value side
To assess these probabilities, we need to consider the value side: what the project is expected to deliver, and how sure we are that it will. Two projects with identical cost curves can carry very different risk. If the business case is solid and the technology proven, little of the money is in doubt. If nobody yet knows whether the product will work, sell, or pay back, all of it is.
Figure 3 illustrates this for the second project. The orange curve is the accumulated cost seen previously and the blue band is the range of what the project could end up being worth, given what we know at each point in time. At the beginning of the project, the band is wide. We know little about whether the product will work, sell, or pay back. As the project builds knowledge, the band narrows.
Now imagine asking “will this pay off?” at three points in time. After 12 months the project has cost about 190 k€. The band is still wide, so we cannot be sure yet, but a “no” would be cheap to act on. After 24 months about 530 k€ has been spent and the band has narrowed. The answer is clearer, but stopping now costs more. After 60 months the band is narrow and the answer is clear: the project is only worth about 1.5 M€, less than the 2.4 M€ it cost. Sadly, that clarity often arrives only when the product is about to be launched and the total cost of ownership is put on the table. By then the most money is at risk and the project is least able to turn around.
What real projects show
The two made-up example projects highlighted here show two different cost profiles with linearly and quadratically growing accumulated cost. In real-world projects there is an even larger variation. Some projects have flatter curves and others steeper ones. And it is not uncommon that the shape changes depending on the project phase. What all projects have in common, regardless of industry and application, is that they have cost and value sides that need to be considered.
Sometimes information showing the importance of looking at both sides is made publicly available via media. One example is the introduction of the patient record system Millennium in two Swedish regions, Västra Götaland and Skåne. The implementation first caught the media’s attention when the system went live in Region Västra Götaland in November 2024. The system was put on hold within days, after staff protested that it put patient safety at risk [1, 2], and the region later decided not to introduce it again [3]. Region Skåne signed its contract for Millennium in 2018. Doctors, lawyers and data security experts warned repeatedly about missing functionality and patient safety [4], yet the work continued until 2026, when Region Skåne also scrapped the system [4, 5]. While media reports give limited insight into the internal discussions of these projects, it seems there were early warnings about the value side that were not acted on. In both cases, not acting on those warnings became costly. According to Sydsvenskan, Region Skåne’s effort cost at least 3.5 billion SEK [4, 5].
Another example highlighted in Swedish media is the battery manufacturer Northvolt. For years the company struggled to get production going in its giant battery factories. Costs ran ahead of revenue, and the cash ran out when investors and banks stopped providing capital [6]. When Northvolt applied for Chapter 11 protection in the United States in November 2024, its debts were well over 50 billion SEK, according to court documents reported by Sydsvenskan [6]. As with Millennium, media reports give limited insight into the internal discussions, and I make no claims about the causes. What the case shows is cost and value moving apart. Large sums were committed long before the value, in the form of working production and revenue, was proven. By the time that became clear, the cost was already committed.
Where system simulation fits in
So how does system simulation fit into this context? While simulation alone isn’t a cure for large-scale projects like the Millennium implementation or Northvolt, a model can support the cost and value sides of projects in many ways. It can help us learn earlier, narrowing the value band while there is still room for adjusting the design. It can help us become faster, shortening the project and with it the accumulated cost. And it can help us flatten the cost curve by making us less dependent on costly hardware tests and late changes.
Figure 4 shows an example modeled in Modelica. It is a chilled-water plant for process cooling, for example on a production line where downtime is costly and the heat load varies over the day. Two chillers work in parallel, each with its own pump and isolation valve. A buffer tank smooths the load, a staging controller starts and stops the chillers based on the tank temperature, and the water circulates through the process line.
Figure 5 shows one production day where the load varies between 60 and 140 kW. Chiller 1 is out of service for two hours during the longest peak. Since one chiller delivers only 100 kW, it cannot carry the 140 kW peak alone. With a model, we can explore scenarios like this to see what a failure does to the process, and dimension components, such as the size of the buffer tank, before any equipment is ordered. A problem found in the model is fixed by changing a parameter. If found at commissioning, it means software changes or added equipment.
How we work with a model determines what value we can gain. Developing a model of an existing system while focusing only on answering the question “does it replicate the measurements?” is risky, because the answer doesn’t necessarily add any insights about the system other than what is already available from looking at the measurement data. Yet, in my experience, this kind of reactive modeling is widespread in the industry. Changing the question into “why does it behave the way it does?” forces us to work proactively. While that may be a longer road, working proactively helps us build the vital knowledge required to seize all the opportunities that come with dynamic system simulation. The value does not come from having the model. It comes from working with it.
In the coming chapters of this series, we’ll dig deeper into how proactive system analysis can help us build knowledge that targets real business objectives.
References
- Sveriges Radio (Radio Sweden), "After outcry by healthcare staff - new Millennium journal put on hold", 15 November 2024. Link
- SVT Nyheter, "Regiontoppen: Millennium blev inte bra", 19 November 2024. Link
- SVT Nyheter, "Politikerna överens: Millennium ska stoppas", 3 December 2025. Link
- Sydsvenskan, "Här är misstagen som sänkte Millennium" (the mistakes that sank Millennium), 29 June 2026. Link
- Sydsvenskan Direkt, "Definitivt besked från regionen: Millennium skrotas", Kenan Habul, 15 October 2026. Link
- Sydsvenskan, "Northvolt inte utslaget ännu – men nere för räkning", 23 November 2024. Link
🚀 Ready to Go Further with Modelica?
Whether you want to build your skills or get hands-on help with a real project, we can help.
📚 Build your skills.
Our Modelica Introduction Course is a two-day, hands-on program covering system modeling and simulation from the ground up. Perfect for engineers, innovators, and anyone ready to build smarter systems.
💬 Have a project in mind?
Book a free call and we'll talk through your specific modeling, simulation, or digital twin challenge.